Soft Strip Headingley – Tetley Hall

Contracted by Fox Lloyd Jones, we carried out a soft strip in Headingley at the historic Tetley Hall, with particular focus on protecting a number of historically important architectural features.

The Brief

Our team was asked to carry out this project due to our extensive experience in soft strip services where detailed planning was required alongside the removal of large volumes of waste.

The main focus of this project was to soft strip a wide range of fixtures and materials from the historically important Tetley Hall, a former residence of the famous brewing family.

We were also to be accountable ensuring the responsible and compliant disposalof all stripped materials.

Key project challenges

The primary challenges with this soft strip project were the need to manage a large amount of waste within a historic residential building, while alsoprotectinga number of important original features including:

  • The main staircase’s oak banister
  • A stained-glass window
  • The original mosaic tiled floor

Difficult winter weather conditions, a site with limited access and close proximityto student and elderly accommodation made planning waste disposal schedules particularly demanding.

Soft strip services provided

Our experienced team carried out the soft strip and clearance of a varied range of items, including:

  • Floor coverings – carpets, tiles etc
  • Extensive plaster and lath ceilings areas
  • All bathroom fixtures and fittings.
  • Window frames
  • Skirting boards and architraves
  • Pigeon guano
  • Fire escape gantry

 

Waste disposal containers and transport were provided by our sister company Foxhall Environmentalwho transported the waste to our local transfer station (to reduce vehicle milage) and provided the digital waste consignment notes to the client. We always aim to minimise the environmental impact of our work and on this project over 95% of all waste was recycled.

To ensure safety and compliance a fully comprehensive risk assessment and methodology statement were produced, along with a site file including daily updates and work permits.

How we did it

A number of teams were established to cover different tasks. Our staff all follow strict working practices, are randomly drug and alcohol tested and have a minimum of:

  • CSCS – Labourer Card
  • Manual Handling
  • Working at Height
  • Asbestos Cat B
  • Asbestos Medical
  • Face Fit Test

Each team also had a staff member with these additional qualifications and certifications:

  • PASMA certified
  • MEWP certified
  • First Aid at Work
  • CSCS – Supervisor Card.
  • Abrasive Wheels

Project results

This demanding project was completed within the planned timescales to the agreed standards and the customer was particularly pleased with the professionalism shown by the team.

We’re proud of the successful results we achieved with this challenging soft strip project in Headingley’s well-know Tetley Hall – if you have a demolition or soft strip requirement, drop us a line to see how we can help.